hs_01


Technical information

Location Essex
Capacity 18.8 MWp
ROCs 1.4
EPC Push Energy
Panels Yingli
Inverter SMA
Operational Since Mar-15

Project Description

Boxted site is located north of Colchester in Essex on the now disused Boxted Airfield. Boxted has a capacity of
18.8MW and was acquired in March 2015, after it became operational. The site has produced 18.6GWh (+3.0% vs. budget) since acquisition to 31 March 2016. The acquisition cost was £20.6m and the investment value at year end was £20.1m, which is 5.2% of the portfolio value. The site has been sympathetically installed and benefits from wildflower seeding which has been specifically designed to enhance the local wildlife population.



Aerial View

[KGVID width=”640″ height=”360″]http://nextenergysolarfund.com/wp-content/uploads/2015/06/Boxted1.mp4[/KGVID]

Gallery